The zigzagging of the overhead line is not really demanded for trolley poles. For tramways, a Get hold of wire and not using a messenger wire is employed.Two wire operates about two tracks supported and registered by just one mast positioned within the centre from the tracks with cantilever arms hooked up to reverse sides. Usually employed on tram